• Track Laying


    Track laying in the 50's were done by hand, (almost). The tracks were laid on a wooden bed. Anyway, they did not have the macinery that we have today.



    Mike's N Scale Banner


    Take a look at the new technologie 53 years later in 2009. The tracks are now laid on a concrete bed.



    Mike's N Scale Banner



    Mike's N Scale Banner


    « Clever WayNetwork Rail Engineering »

  • Comments

    No comments yet

    Suivre le flux RSS des commentaires

    Add comment

    Name / User name:

    E-mail (optional):

    Website (optional):